NEW QUESTION 15
Which of the following are valid scheduling parameter in the multiple-counter plan? choose 2 answers

  • A. Or-link
  • B. start counter reading
  • C. call horizon
  • D. schedule period

Answer: A,D

 

NEW QUESTION 16
What is the consequences when you activate alternative labelling? choose 1 answer

  • A. you can change the primary functional location label and delete the old function location label
  • B. you CANNOT deactivate an alternative labeling
  • C. you can change the primary functional location label and keep the old label as a historical labe
  • D. the labeling system must be assigned to the functional location category

Answer: C

 

NEW QUESTION 17
Which of the following statements about work centers are correct?

  • A. They are only used in maintenance.
  • B. They form the basis for cost calculation, capacity planning, and scheduling.
  • C. They are organizational units that define when and where an operation must beperformed.
  • D. They can be machine, production lines, or people.

Answer: B,C,D

 

NEW QUESTION 18
When the planner checks the capacity load of work center, which data of the order is used? choose 2 answers

  • A. amount of work
  • B. duration of the activity
  • C. basic start
  • D. scheduled start

Answer: A,B

 

NEW QUESTION 19
What is the purpose of the SAP GUI Bleize Theme? choose 1 answer

  • A. make web dynpro app available for SAP GUI
  • B. make SAPUI5 app available for SAP GUI
  • C. create a simplified copy of a transaction
  • D. create a similaire user experience as in SAP fiori launchpad

Answer: D

 

NEW QUESTION 20
You need to create a structuring element within a BOM without the view for physical inventroy. which material type do you use? choose 1 answer

  • A. spare part ( ERSA)
  • B. non-valuated (UNBW)
  • C. operation suppliers (HIBE)
  • D. maintenance assembly (IBAU)

Answer: D

 

NEW QUESTION 21
Which of the following is true about SAP Work Manager?

  • A. It is used in combinations with SAP ERP and S/4HANA
  • B. It is available only on SAP Cloud Platform
  • C. It is available in On Premise Edition and Cloud Edition
  • D. It is used in combinations with S/4HANA

Answer: A,C

 

NEW QUESTION 22
The maintenance engineer creates a singel cycle plan with the following parameters:
* the call object is maintenance order
* the indicator or seprate completion of maintenance call date is NOT set
* the indicator for completion requirement is NOT activated
* both shift factors are set to 100% .
Which date is relevant for the calculation for further planned dates for all objects? choose 1 answer

  • A. planned date of the next call number
  • B. technical completion date of the maintenance order
  • C. completion date of maintenance plan
  • D. basic finish date of the maintenance order

Answer: A

 

NEW QUESTION 23
What is the purpose of the initial and subsequent buffers in a maintenance strategy? choose 1 answer

  • A. to set the planned date
  • B. to set the call date
  • C. to set the start date of the maintenance plan
  • D. to set the start/end date of the maintenance order

Answer: D

 

NEW QUESTION 24
What are the effects when the planner release a maintenance order? choose 3 answers

  • A. the warehouse clerk can post a goods issue
  • B. the planner can print the job papers
  • C. the planner CANNOT change planned costs
  • D. the planner can estimate costs
  • E. the technician can record confirmations

Answer: A,B,E

 

NEW QUESTION 25
Which of the following statements about commitments management are correct?

  • A. Commitments are used to update and monitor resources that are required for external procurement.
  • B. Commitment data is built up when the scheduled order resources are valuated.
  • C. Commitment values can exceed planned costs.
  • D. Commitments are contractual obligations that are entered in accounting.
  • E. Commitments lead to actual costs as a result of various business transactions.

Answer: A,B,C,E

 

NEW QUESTION 26
What is a prerequisit to start a performance-based maintenance plan? choose 1 answer

  • A. intial measurement document
  • B. scheduling period
  • C. call horizon
  • D. cycle modification factor

Answer: A

 

NEW QUESTION 27
Which of the following is scheduling indicator? choose 1 answer

  • A. time-latest date
  • B. time-earliest date
  • C. time-fixed date
  • D. time-key date

Answer: D

 

NEW QUESTION 28
Which valuation category do you use to refurish the material? choose 1 answer

  • A. retail
  • B. origin
  • C. condition-based
  • D. in-house/ external procurment

Answer: C

 

NEW QUESTION 29
What is feature of the technical object breakdown SAP fiori app? choose 1 answer

  • A. the underlying infocube
  • B. the visualization in SAP lumira
  • C. the underlying CDS view
  • D. the presentation in an SAP BW Query

Answer: C

 

NEW QUESTION 30
Why was the application code completely rewritten for SAP S/4HANA?

  • A. To ensure that the code is optimized for SAP HANA
  • B. To take advantage of the simpler data model
  • C. SAP S/4HANA is now built with Java
  • D. The optimized ABAP code that we developed for Suite on SAP HANA would not work with SAP S/4HANA

Answer: A,B

 

NEW QUESTION 31
what is primary goal of sap perdictive maintenence and service? choose 1 answer

  • A. to precalculate maintenance projects
  • B. to collect and analyze machine data
  • C. to create a cloud-based equipement directory
  • D. to provide advanced cost controlling analysis

Answer: A

 

NEW QUESTION 32
What must you maintain before you create the measuring point or counters for technical objects? choose 1 answer

  • A. create necssary characterisitics in the calssification system
  • B. assign characterisics to classes
  • C. enter an annual estimate
  • D. create a code group in the necssary catalog

Answer: A

 

NEW QUESTION 33
What must you assing for a cross-plant planning scenario? choose 1 answer

  • A. the same planner group to multiple maintenance plants
  • B. multiple planning plants to a maintenance plant
  • C. the same planner group to multiple plants
  • D. the same planning plant to multiple maintenance plants

Answer: D

 

NEW QUESTION 34
A piece of equipment cannot be linked to a material. Determine whether this statement is true or false.

  • A. False
  • B. True

Answer: A

 

NEW QUESTION 35
......