SAP E-S4HCON2023 Dumps Questions [2025] Pass for E-S4HCON2023 Exam [Q42-Q65]

Share

SAP E-S4HCON2023 Dumps Questions [2025] Pass for E-S4HCON2023 Exam

Updated SAP Study Guide E-S4HCON2023 Dumps Questions


SAP E-S4HCON2023 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Perform the modification adjustment with SPDD and SPAU: The modification adjustment process teaches SAP consultants how to adapt modified objects using SPDD and SPAU effectively. They learn to ensure that custom developments remain compatible with SAP S
  • 4HANA functionalities.
Topic 2
  • Describe the handling of the SAP system landscape during SAP S
  • 4HANA conversion and SAP system upgrade: Managing the SAP system landscape involves strategic planning for compatibility with SAP S
  • 4HANA. Consultants learn to assess dependencies among systems to facilitate a seamless transition with minimal disruption.
Topic 3
  • Describe and perform the actions necessary during the SAP S
  • 4HANA conversion prepare phase: Consultants learn to define project scope and conduct readiness assessments to identify gaps in the existing SAP landscape. This foundational phase is crucial for aligning project objectives with business goals.
Topic 4
  • Perform the SUM prepare part: In the SUM prepare part, aspiring SAP consultants verify system prerequisites and execute the SAP Readiness Check. They also learn to prepare custom code for adaptation, reducing risks in the conversion process.
Topic 5
  • Perform the SUM prepare part: During the SUM execution, SAP consultants utilize the Software Update Manager for database migration options (DMO) and software updates. They learn to monitor processes closely to maintain data integrity and address errors promptly.
Topic 6
  • Describe the factors influencing downtime and techniques to reduce downtime: In this topic, SAP Consultants explore factors influencing downtime, such as system complexity and data volume. They learn techniques for optimizing performance and leveraging migration tools to reduce downtime during upgrades.

 

NEW QUESTION # 42
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:

  • A. It is target release specific
  • B. It contains a section "free space requirements"
  • C. It is a database-specific document
  • D. It contains a troubleshooting section

Answer: A,B


NEW QUESTION # 43
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:

  • A. Execution of eCATTs for business validation tests
  • B. Execution of XPRAs and AIMs
  • C. Execution of SPAU modification adjustment
  • D. Creation of the table structures in the new SAP HANA database
  • E. Execution of SPDD modification adjustment

Answer: A,B,C


NEW QUESTION # 44
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?

  • A. Downtime Optimized DMO (DoDMO)
  • B. Near-Zero Downtime Technology (NZDT)
  • C. Near-Zero Downtime Maintenance (nZDM)
  • D. Downtime Optimized Data Conversion (DoC)

Answer: B


NEW QUESTION # 45
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:

  • A. SAP S/4HANA conversion to SAP S/4HANA 1709
  • B. Updating to SAP ECC 6.07 using DMO
  • C. Using DMO when applying Support Packages to SAP ECC 6.07
  • D. Upgrading to SAP ECC 6.08 without using DMO

Answer: A,D


NEW QUESTION # 46
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. Dedicated application tables are migrated in uptime
  • B. The repository is migrated in uptime
  • C. TABIMJJPG is executed in uptime
  • D. An additional temporary database is used during uptime

Answer: A


NEW QUESTION # 47
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
  • B. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
  • C. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
  • D. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete

Answer: D


NEW QUESTION # 48
In ICNV. How database operations synchronized between the source and the target table?

  • A. AA
  • B. Deletes are directly executed in the target table by delete trigger.

Answer: B


NEW QUESTION # 49
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.

  • A. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
  • B. Depending on the SAP S/4HANA version, there are different SI check frameworks.
  • C. You need to build up a SI check framework by applying SAP notes.
  • D. The SI checks are executed in the development system and the results are transported into the subsequent systems.

Answer: B,C


NEW QUESTION # 50
ICNV initialization does 3

  • A. AA
  • B. Build index on flag column
  • C. Creation of views
  • D. Creation of flag

Answer: B,C,D


NEW QUESTION # 51
You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox?
Please choose the correct answer.
Response:

  • A. /ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)
  • B. /ASU/SSM (ASU Simple Schedule Manager)
  • C. /ASU/SHOW_NOTE (Show SAP Note via Web-Browser)
  • D. /ASU/START (Start ASU Toolbox)

Answer: D


NEW QUESTION # 52
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:

  • A. By searching for transport requests that are assigned to the project SAP_ADJUST
  • B. By searching for transport requests in DIR_TRANS, subdirectory "transport"
  • C. By searching for transport requests named <SID>K0<number>
  • D. By searching for transport requests in the file umodauto.Ist

Answer: D


NEW QUESTION # 53
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A. Unicode conversion SAP S/4HANA conversion including database migration
  • B. Unicode conversion SAP S/4HANA conversion without database migration Database migration
  • C. Unicode conversion Database migration SAP S/4HANA conversion without database migration
  • D. SAP S/4HANA conversion including database migration and Unicode conversion
  • E. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration

Answer: A,C,E


NEW QUESTION # 54
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above?
There are 3 correct answers to this question.

  • A. Database migration
  • B. Support Package Stack update
  • C. Dual Stack split
  • D. Release upgrade
  • E. Homogenous system copy

Answer: A,B,D


NEW QUESTION # 55
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:

  • A. Conversion of application tables (PARCONV_UPG)
  • B. Activation of dictionary objects (ACT_UPG)
  • C. Switch to new repository (EU_SWITCH)
  • D. Modification adjustment (SPDD)

Answer: B,D


NEW QUESTION # 56
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.

  • A. Prerequisite check
  • B. SAP S/4HANA conversion without DMO
  • C. SAP S/4HANA conversion including DMO
  • D. Benchmark tool
  • E. DMO without system update

Answer: A,B,C


NEW QUESTION # 57
What are the benefits of using the benchmarking option of the DMO for SUM? Note There are 2 correct answers to this question

  • A. You can verify that the content of the download directory matches the stack XML file.
  • B. You can record the modification adjustment during migration and use the transports in the next runs.
  • C. You can find the optimal number of parallel H3load processes by monitoring host performance
  • D. You can obtain migration duration tiles from a previous benchmark run that can be used to optimize the next runs

Answer: C,D


NEW QUESTION # 58
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Perform the migration of data into the new data structure
  • B. Run the database migration to the SAP HANA database
  • C. Apply the recommendations of the simplification list
  • D. Check the compatibility of custom code with SAP S/4HANA

Answer: C,D


NEW QUESTION # 59
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:

  • A. Keep archiving on during the whole procedure.
  • B. Reuse a profile for the shadow instance from a previous run.
  • C. Choose the instance number of the shadow instance.
  • D. Use the Near Zero Downtime Maintenance Technology (NZDM).

Answer: B,C


NEW QUESTION # 60
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: B


NEW QUESTION # 61
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

  • A. Network capacity between exporting and importing R3load processes must be.
  • B. The source system is non-Unicode and the target database is a scale-out system.
  • C. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • D. The target database size increases temporarily because of the Shadow Repository.
  • E. SAP HANA Landscape Reorganization required a manual step to edit a file.

Answer: C,E


NEW QUESTION # 62
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:

  • A. Check the most recent entries in SAPup.log
  • B. Check the messages shown by the SUM UI
  • C. Check the system log (transaction SM21) of the SAP system
  • D. Check the most recent entries shown in file sapevt.trc

Answer: A,B


NEW QUESTION # 63
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:

  • A. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
  • B. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
  • C. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
  • D. These are 40 pairs of R3load processes, so there are 80 R3load processes running.

Answer: D


NEW QUESTION # 64
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:

  • A. Before the downtime starts
  • B. At the end of the downtime
  • C. As part of the cleanup process
  • D. Early in the downtime

Answer: A


NEW QUESTION # 65
......

Achieve Success in Actual E-S4HCON2023 Exam E-S4HCON2023 Exam Dumps: https://www.practicetorrent.com/E-S4HCON2023-practice-exam-torrent.html

Valid E-S4HCON2023 exam with SAP Real Exam Questions: https://drive.google.com/open?id=1UWnLidVZNxBTJ4u9ado8R8_qy0CtG2ks