NEW QUESTION 30
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?

  • A. The corrections to the SUM Guide
  • B. The link to different patch levels to SUM
  • C. AA
  • D. An overview about possible upgrade paths

Answer: A,B,D

 

NEW QUESTION 31
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:

  • A. It is a database-specific document
  • B. It contains a section "free space requirements"
  • C. It is target release specific
  • D. It contains a troubleshooting section

Answer: B,C

 

NEW QUESTION 32
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?
There are 2 correct answers to this question.
Response:

  • A. Release the transport request containing the modification adjustment
  • B. Manually activate the adjusted dictionary objects
  • C. Assign the transport request as a modification adjustment transport
  • D. Create "modified* versions of the objects that you need to adjust

Answer: C,D

 

NEW QUESTION 33
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:

  • A. SAT (Runtime Analysis)
  • B. SYCM (Simplification Database Content)
  • C. SE80 (Object Navigator)
  • D. ATC (ABAP Test Cockpit)

Answer: C,D

 

NEW QUESTION 34
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:

  • A. Keep archiving on during the whole procedure.
  • B. Reuse a profile for the shadow instance from a previous run.
  • C. Use the Near Zero Downtime Maintenance Technology (NZDM).
  • D. Choose the instance number of the shadow instance.

Answer: B,D

 

NEW QUESTION 35
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:

  • A. SUM without DMO
  • B. SWPM using the Load procedure
  • C. SWPM using the Backup / Restore procedure
  • D. SUM with DMO

Answer: B

 

NEW QUESTION 36
You are performing an S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of dictionary objects (SPDD)?
Please choose the correct answer.
Response:

  • A. Credentials of user DDIC in client 000 of the shadow system
  • B. Credentials of user DDIC in the development client of the development system
  • C. Credentials of a named user in the development client of the development system
  • D. Credentials of a named user in client 000 of the shadow system

Answer: D

 

NEW QUESTION 37
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Check the compatibility of custom code with SAP S/4HANA
  • B. Apply the recommendations of the simplification list
  • C. Run the database migration to the SAP HANA database
  • D. Perform the migration of data into the new data structure

Answer: A,B

 

NEW QUESTION 38
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.

  • A. The transport between Unicode and non-Unicode systems is forbidden.
  • B. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
  • C. The upgrade of the PRD must be finished before you start new development in the DEV.
  • D. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.

Answer: B

 

NEW QUESTION 39
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:

  • A. Activation of dictionary objects (ACT_UPG)
  • B. Switch to new repository (EU_SWITCH)
  • C. Conversion of application tables (PARCONVJJPG)
  • D. Modification adjustment (SPDD)

Answer: A,D

 

NEW QUESTION 40
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:

  • A. To repeat specific phases during the SUM run
  • B. To make the progress information within SUM UI more accurate
  • C. To skip selected phases during the SUM run
  • D. To auto-fill specific fields on selected screens on the SUM UI

Answer: B

 

NEW QUESTION 41
Which Guides contain information about SUM phases starting with "EU_CLONE_"?
There are 2 correct answers to this question.
Response:

  • A. The major SUM Guide
  • B. The SAP S/HANA Conversion Guide
  • C. The DMO Guide
  • D. The Application Guide

Answer: B,C

 

NEW QUESTION 42
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:

  • A. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
  • B. In the job log for the corresponding job in SM37 (Job Overview)
  • C. In the corresponding R3trans log files of this phase
  • D. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp

Answer: A,B

 

NEW QUESTION 43
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:

  • A. Import of dictionary objects from the download directory in phase DDIC_UPG
  • B. Activation of dictionary objects in phase ACT_UPG
  • C. Import of upgrade and language data from the download directory in phase TABIM UPG
  • D. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
  • E. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE

Answer: A,B,C

 

NEW QUESTION 44
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correct answers to this question.
Response:

  • A. Check the log files written under "SUM\abap\log"
  • B. Check the dump size of the database export on disk
  • C. Check logs for jobs starting with "RSUPG_SGEN" in the system
  • D. Check the "Charts Control Center" in the SUM UI

Answer: A,D

 

NEW QUESTION 45
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
  • B. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
  • C. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
  • D. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.

Answer: B

 

NEW QUESTION 46
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?
Please choose the correct answer.

  • A. Credentials of user DDIC in client 000 of the shadow system
  • B. Credentials of user DDIC in the development client of the development system
  • C. Credentials of a named user in the development client of the development system
  • D. Credentials of a named user in client 000 of the shadow system

Answer: C

 

NEW QUESTION 47
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. The repository is migrated in uptime
  • B. Dedicated application tables are migrated in uptime
  • C. TABIMJJPG is executed in uptime
  • D. An additional temporary database is used during uptime

Answer: B

 

NEW QUESTION 48
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.

  • A. Kernel for target release, Linux, SAP HANA
  • B. Kernel for target release, Windows, SAP HANA
  • C. Kernel for target release, Windows, SAP MaxDB
  • D. Kernel for source release, Windows, SAP MaxDB

Answer: B,D

 

NEW QUESTION 49
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:

  • A. The SAP Support Packages that will be bound to the upgrade
  • B. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
  • C. The SAP Support Packages contained in the upgrade media
  • D. The SAP Support Packages found in the download directory

Answer: D

 

NEW QUESTION 50
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:

  • A. Downtime migration (EU_CLONE_MIG_DT_RUN)
  • B. ParaUel distribution (PARDIST_SHD)
  • C. Uptime migration (EU_CLONE_MIG_UT_RUN)
  • D. Shadow repository creation (EU_IMPORT*)

Answer: C

 

NEW QUESTION 51
During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?

  • A. SUM continues with the next phase and your modifications are kept as In the start release
  • B. SUM continues with the next phase and your modifications are lost
  • C. Before continuing with the next phase SUM asks for a modification adjustment transport
  • D. SUM refuses to continue unless you have marked a transport request as modification adjustment transport

Answer: A

 

NEW QUESTION 52
......